The enterprise management layer for SAP S/4HANA is currently available on release 2022 FPS02.
It will become available for release 2023 FPS00 in March 2024.
Please note that the delta scope overview below is not final yet.
This post outlines scope changes compared to the 2022 release of the enterprise management layer. Scope items that existed in previous releases might have been updated, for example, due to new functionality being available in release 2023 or due to new statutory requirements in some countries. These changes are not reflected in this list.
Detailed information and complete overview documents will become available in SAP Signavio Process Navigator in Q1 2024.
For a complete overview of changes of SAP Best Practices scope items, see the What’s New information on help.sap.com.
For a complete overview of scope items we added to the enterprise management layer previously, for release 2022 or prior, please see the What’s New posts of my blog.
New scope items: | |
3M3 | Event-Based Revenue Recognition – Service Documents |
3M4 | Event-Based Revenue Recognition – Service Documents – IFRS 1) |
Previously optional scope (renamed): | |
6AU | Corrective Service with Advanced Execution |
6F1 | Preventive Service with Advanced Execution |
6AK | Event-Based Revenue Recognition – Service with Adv. Execution |
6AL | Event-Based Revenue Recognition – Service with Adv. Execution – IFRS |
No longer available: | |
1R3 | Engineering Bill of Material – Change Master Management |
1R5 | Engineering Bill of Material Mass – Change |
1ZI | Basic Handover of Bill of Material |
6B5 | Asset-Backed Securities Management | OPT | [08] | Treasury&Risk Mgt |
6B6 | Asset-Backed Securities Management – Group Ledger IFRS | OPT | [08] | Treasury&Risk Mgt |
6ND | Securities Option Management | OPT | [08] | Treasury&Risk Mgt |
6NE | Securities Option Management – Group Ledger IFRS | OPT | [08] | Treasury&Risk Mgt |
6OT | Bill of Material Management Professional | OPT | [26] | R&D for Enterprise Product Engineering |
For Product Lifecycle Management, we now have two scope options:
1QA | Specification Management for Recipes | OPT | [25] | R&D for Enterprise Product Formulation |
1QC | Formulation – Recipe Development | OPT | [25] | R&D for Enterprise Product Formulation |
1QG | Recipe Handover to Production – Bill of Material | OPT | [25] | R&D for Enterprise Product Formulation |
22R | Advanced Ingredient Replacement for Recipes | OPT | [25] | R&D for Enterprise Product Formulation |
5QC | Product Change Management with Change Records – Process Industries | OPT | [26] | R&D for Enterprise Product Engineering |
64E | Product Change Mgmt with Change Records – Discrete Industries | OPT | [26] | R&D for Enterprise Product Engineering |
6OT | Bill of Material Management Professional | OPT | [26] | R&D for Enterprise Product Engineering |